A robot will soon try to remove melted nuclear fuel from Japan's destroyed Fukushima reactor

business2024-05-29 09:55:2651

TOKYO (AP) — The operator of Japan’s destroyed Fukushima Daiichi nuclear power plant demonstrated Tuesday how a remote-controlled robot would retrieve tiny bits of melted fuel debris from one of three damaged reactors later this year for the first time since the 2011 meltdown.

Tokyo Electric Power Company Holdings plans to deploy a “telesco-style” extendable pipe robot into Fukushima Daiichi No. 2 reactor to test the removal of debris from its primary containment vessel by October.

That work is more than two years behind schedule. The removal of melted fuel was supposed to begin in late 2021 but has been plagued with delays, underscoring the difficulty of recovering from the magnitude 9.0 quake and tsunami in 2011.

During the demonstration at the Mitsubishi Heavy Industries’ shipyard in Kobe, western Japan, where the robot has been developed, a device equipped with tongs slowly descended from the telescopic pipe to a heap of gravel and picked up a granule.

Address of this article:http://philippines.campingcolorado.net/article-38d399957.html

Popular

Body of newborn infant found at recreation area in northwest Missouri

Moss pink flowers in full bloom in Heibei

Scenery of Minjiang River estuary wetland in Fuzhou

Xi Sends Congratulatory Message to Lanting Forum on Chinese Modernization and the World

A Kentucky family is left homeless for a second time by a tornado that hit the same location

African lion cubs survive extreme environment of Qinghai

Jiangcun Village in East China's Jiangsu: sample of China's rural development

Lotus flowers seen across China

LINKS